Irish Association Of Self Builders

Copyright © 2003 - 2014 Irish Association of Self Builders


Share on Facebook
Share on Twitter
Share via e-mail
Share on Google Bookmarks

Iaosb.Com

Ireland’s Number One Website For Building A House

Legal & Finance Design & Planning Schedule & Cost Health & Safety Renewable Energy Water Supply Heating & Insulation
Home Waste Management Problems & Solutions Tools & Machinery Contact Us Advertise
Directory Building Stages Building  Materials Household Appliances Landscape & Gardening How To Videos

Iaosb.Com

Planning Permission


There are mainly three types of planning permission in Ireland that a self builder can apply for and they are:


Outline planning permission

Permission following grant of outline permission

Full planning permission


Before we go into details of the differences on the above permissions, there are a few things to remember and consider before an application is made.



What is the difference between the above permissions:


Outline planning permission is sought when you are planning to build a house in the near future but you have not yet decided on the design or you might not be ready yet for your own personal reasons. You still have to inform the planning department of your intentions as far as the design and Waste Management . For example, is it going to be a single or two storey building. Is it going to be septic tank or a bio waste treatment system.


Permission following the grant of outline planning permission is applied for when you are ready to go ahead with your design and you have all the required documentation needed for a full permission.


Full planning permission can be applied for when you have already decided on all your plans and designs and you wish to go ahead with the construction as soon as you are ready.


A planning permission is usually valid for five years but this should be confirmed with your local planning department.


What happens if your planning permission is refused:


The planning system includes a comprehensive appeals process. Under this, all planning decisions made by planning authorities may be subject to independent review by An Bord Pleanala.


The appeal must be made within 4 weeks beginning on the date of the making of the decision by the planning authority.


The appeal must be made in writing and posted or delivered to:


The Secretary, An Bord Pleanala, 64 Marlborough Street, Dublin 1.

Tel: 01 8588100 or locall 1890 275 175

Web site www.pleanala.ie , E-mail bord@pleanala.ie


The appeal must be fully complete from the start. You are not permitted to submit any part of it later on, even within the time limit and it must include:



Further information about the appeal process can be obtained from An Bord Pleanala or your Local Planning Department or Planning refused making an appeal


The seven year rule


When you receive your planning permission, as one of the conditions you might see the following condition

“ The proposed dwelling house for a period of seven years from the date of completion shall be for the sole use of the (applicant or applicant and subsequent owners).


What this means is that if it only has applicant under the condition, should you wish to sell the property within seven years of the house being completed, you will need permission from the local planning department before you can go ahead with the sale. The reason for this has been explained as in the interests of sustainable development.


However, if the wording includes applicants and subsequent owners there should not be a need to inform the local planning department.